[Solved] Project journal

✓ Verified Academic Solution Available

Executive Solution Overview

See attached. – ## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf – ## unit4instructions.pdf – ## UnitIV.pdf **## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf** Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this bo…

Instant Solution Download

$6.99

Immediate access to the full model answer, formatted citations, and rubric breakdown.

Need a Fresh Custom Paper?

Have this question answered from scratch according to your specific instructions and deadline.

Order on TutorsGallery →

Assignment Prompt & Instructions

See attached.

– ## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf

– ## unit4instructions.pdf

– ## UnitIV.pdf

**## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf**

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

**## unit4instructions.pdf**

Unit 4 instructions

Read Case 9.6 “The ‘Now’ Wedding-Part A and Part B” of your textbook, and imagine that you are in
charge of planning the wedding discussed in the case.
After reading the case, address the following prompts based on the case details.

Determine and describe the known and unknown risks that may prevent the wedding from
taking place on January 21, including those listed in Part B. What are some ways that these
risks will affect the wedding planning project?
Describe how you, as the wedding planner, will respond to these risks to ensure that the
wedding will still occur on the predetermined date.

Your response should be a minimum of one page in length and formatted as an essay. Citations and
references are not required; however, if outside sources are used, please adhere to APA Style when
creating citations and references for this assignment. APA formatting, however, is not necessary.

**## UnitIV.pdf**

MGT 4301, Project Planning 1

Course Learning Outcomes for Unit IV

Upon completion of this unit, students should be able to:

6. Explain the risk management process, including risk identification, analysis, and response.
6.1 Identify risks within a project and how they may affect the project.
6.2 Describe how a project manager should respond to risks found in a project.

Required Unit Resources

Chapter 7: Managing Risk—Read the following sections:

• Introduction
• 7.1–7.9
• Summary

Chapter 8: Scheduling Resources and Costs—Read the following sections:

• Introduction
• 8.1–8.10
• Summary

Chapter 9: Reducing Project Duration—Read the following sections:

• Introduction
• 9.1–9.6
• Summary

Unit Lesson

Risk

All projects involve some form of risk. Risk factors are identified and classified as known or unknown and are
accounted for accordingly. Risk factors include things that could possibly happen and that the project team is
aware of, such as inclement weather, increased supplier costs, and personnel issues, as well as unforeseen
things, such as drastic changes in market conditions, fire, and catastrophic weather in areas affecting the
project or project suppliers, and changes in customer needs (Larson & Gray, 2021). Once a risk has been
identified, it is analyzed both qualitatively and quantitatively. Qualitative analysis is based on historical
information, expert judgment, meetings, focus groups, surveys, and ranking charts. Quantitative analysis uses
statistical models and methods to determine the likelihood of a risk happening, the impact it would have on
the schedule and the cost of the project, and how severe it would be in comparison to other identified risks.

Risks have to be determined as acceptable or unacceptable for a project to continue. Unacceptable risks can
stop a project before completion. Project managers have options for responding to acceptable risks should
they occur; responses include avoiding, transferring, mitigating, or accepting the risk (Larson & Gray, 2021).
Avoiding a risk usually involves changing the project management plan to eliminate the risk entirely.
Transferring the risk gives it to someone else, usually a third party. Mitigating the risk involves finding ways to
lessen its impact on the project, and accepting the risk does not require any action unless the risk actually
occurs. The project team knows it might happen but does not do anything about it unless it does happen.

UNIT IV STUDY GUIDE
Risks and How to Properly Respond to Them

MGT 4301, Project Planning 2

UNIT x STUDY GUIDE
Title

Essentially the same process that is used to manage negative risks is applied to positive risks. The major
differences occur in the responses. Instead of avoiding negative risks, project managers often try to exploit
positive risks by taking action to ensure that the opportunity occurs. Instead of transferring risks to another
party, project managers often share positive risks to increase the likelihood that the opportunity can be
exploited. Instead of mitigating negative risks, project managers will take action to enhance the likelihood that
the opportunity will occur and/or increase the positive impact of the opportunity. Finally, project managers will
often choose to accept both negative and positive risks but be prepared to respond if either occurs.

A Closer Look

Risk is inherent in every project. It is important to know that risk occurs in the future, not in the past. Anything
that has already happened is no longer risky, even if it was a catastrophic event. There are two general
categories of risks: (1) known unknowns and (2) unknown unknowns. Let’s use some examples to gain a
better understanding of this.

• The 2011 earthquake in Japan: Given that earthquakes happen frequently in the region, most would
categorize it as a known unknown. How about the tsunami after the earthquake? It is evident that
some earthquakes can cause tsunamis; thus, one can correctly assume that this is a known
unknown. How about the threat of radiation leaks at the Fukushima plant after the tsunami washed
ashore? The answer here is a bit tougher, and it depends on whether the plant officials had a
contingency plan. If they did, it is a known unknown. If not, it is either incompetence or an unknown
unknown.

• Hurricane Katrina: The eye of the storm was shown on newscasts, and federal, state, and local
officials ordered an evacuation from the region. One notable point here is that even though the
danger was communicated, the severity was far more than expected. Thus, while the risk was a
known unknown, the actual impact might be correctly labeled as an unknown unknown.

The key takeaway here is that a risk management plan is essential when managing projects. The project
manager should do whatever is possible to prevent negative risks from happening. Given that some risks will
still arise, a contingency plan should always be in place.

Importance of Scheduling Resources and Costs

One of the leading causes of risks in a project is the failure of the project manager to schedule resources and
costs before the project begins. Having a project resource schedule in place is important for the reasons listed
below:

• allows the project manager the chance to make sure that any existing resources are adequate and
available for use because resources are often limited,

• gives the project manager a chance to decide which resources have priority;
• helps the project manager to determine where the real critical path of the project is and if there is

anything that might slow down the progress of the project down the road,
• helps the project manager determine if outside contractors will need to be used, and
• helps the project manager decide if the imposed project duration is realistic (Larson & Gray, 2021).

The failure to schedule resources properly can result in timely and costly delays in the project completion. The
lack of availability in resources can mean that outside resources may need to be brought in to help complete
the project, leading to higher costs to the organization.

MGT 4301, Project Planning 3

UNIT x STUDY GUIDE
Title

According to Larson and Gray (2021), resources can include the components listed below.

Crashing a Project

There are times when it may become necessary to crash a project or, in other words, reduce the duration of a
project. For example, if your organization is producing a product and it is determined that your product must
make it to market sooner rather than later, you may be asked to reduce the time necessary to complete
production. There are several ways this can be done, which are listed below:

• adding additional resources,
• outsourcing some of the work,
• scheduling overtime for employees,
• establishing a core team who will only work on the project, or
• creating a short-term quick solution and then going back and doing it correctly (Larson & Gray, 2021).

While none of these solutions are the best, sometimes they are the best alternative to missing a project
deadline.

Unfortunately, crashing a project can sometimes increase the risk of a project being completed late. Crashing
the project means that slack (float) on noncritical activities will be reduced. When slack of noncritical activities
is reduced, the chance of new critical paths occurring increases; hence, the risk of the project becoming late
increases. In addition, compressing will have the following impact on managing the project:

• reduces flexibility by using slack,
• increases number of critical activities,
• increases interdependencies of paths,
• makes resource scheduling tighter (critical), or
• increases costs (Larson & Gray, 2021).

MGT 4301, Project Planning 4

UNIT x STUDY GUIDE
Title

Conclusion

As you can see, risks come in many forms and can occur at any time. A successful project manager always
ensures that he or she is prepared for risks to occur by having an action plan in place before the project
begins.

Reference

Larson, E. W., & Gray, C. F. (2021). Project management: The managerial process (8th ed.). McGraw-Hill

Education. https://online.vitalsource.com/#/books/9781260736205

[https://online.vitalsource.com/#/books/9781260736205](https://online.vitalsource.com/#/books/9781260736205)

– Course Learning Outcomes for Unit IV
– Required Unit Resources
– Unit Lesson
– Risk
– A Closer Look
– Importance of Scheduling Resources and Costs
– Crashing a Project
– Conclusion
– Reference

**## UnitIV.pdf**

MGT 4301, Project Planning 1

Course Learning Outcomes for Unit IV

Upon completion of this unit, students should be able to:

6. Explain the risk management process, including risk identification, analysis, and response.
6.1 Identify risks within a project and how they may affect the project.
6.2 Describe how a project manager should respond to risks found in a project.

Required Unit Resources

Chapter 7: Managing Risk—Read the following sections:

• Introduction
• 7.1–7.9
• Summary

Chapter 8: Scheduling Resources and Costs—Read the following sections:

• Introduction
• 8.1–8.10
• Summary

Chapter 9: Reducing Project Duration—Read the following sections:

• Introduction
• 9.1–9.6
• Summary

Unit Lesson

Risk

All projects involve some form of risk. Risk factors are identified and classified as known or unknown and are
accounted for accordingly. Risk factors include things that could possibly happen and that the project team is
aware of, such as inclement weather, increased supplier costs, and personnel issues, as well as unforeseen
things, such as drastic changes in market conditions, fire, and catastrophic weather in areas affecting the
project or project suppliers, and changes in customer needs (Larson & Gray, 2021). Once a risk has been
identified, it is analyzed both qualitatively and quantitatively. Qualitative analysis is based on historical
information, expert judgment, meetings, focus groups, surveys, and ranking charts. Quantitative analysis uses
statistical models and methods to determine the likelihood of a risk happening, the impact it would have on
the schedule and the cost of the project, and how severe it would be in comparison to other identified risks.

Risks have to be determined as acceptable or unacceptable for a project to continue. Unacceptable risks can
stop a project before completion. Project managers have options for responding to acceptable risks should
they occur; responses include avoiding, transferring, mitigating, or accepting the risk (Larson & Gray, 2021).
Avoiding a risk usually involves changing the project management plan to eliminate the risk entirely.
Transferring the risk gives it to someone else, usually a third party. Mitigating the risk involves finding ways to
lessen its impact on the project, and accepting the risk does not require any action unless the risk actually
occurs. The project team knows it might happen but does not do anything about it unless it does happen.

UNIT IV STUDY GUIDE
Risks and How to Properly Respond to Them

MGT 4301, Project Planning 2

UNIT x STUDY GUIDE
Title

Essentially the same process that is used to manage negative risks is applied to positive risks. The major
differences occur in the responses. Instead of avoiding negative risks, project managers often try to exploit
positive risks by taking action to ensure that the opportunity occurs. Instead of transferring risks to another
party, project managers often share positive risks to increase the likelihood that the opportunity can be
exploited. Instead of mitigating negative risks, project managers will take action to enhance the likelihood that
the opportunity will occur and/or increase the positive impact of the opportunity. Finally, project managers will
often choose to accept both negative and positive risks but be prepared to respond if either occurs.

A Closer Look

Risk is inherent in every project. It is important to know that risk occurs in the future, not in the past. Anything
that has already happened is no longer risky, even if it was a catastrophic event. There are two general
categories of risks: (1) known unknowns and (2) unknown unknowns. Let’s use some examples to gain a
better understanding of this.

• The 2011 earthquake in Japan: Given that earthquakes happen frequently in the region, most would
categorize it as a known unknown. How about the tsunami after the earthquake? It is evident that
some earthquakes can cause tsunamis; thus, one can correctly assume that this is a known
unknown. How about the threat of radiation leaks at the Fukushima plant after the tsunami washed
ashore? The answer here is a bit tougher, and it depends on whether the plant officials had a
contingency plan. If they did, it is a known unknown. If not, it is either incompetence or an unknown
unknown.

• Hurricane Katrina: The eye of the storm was shown on newscasts, and federal, state, and local
officials ordered an evacuation from the region. One notable point here is that even though the
danger was communicated, the severity was far more than expected. Thus, while the risk was a
known unknown, the actual impact might be correctly labeled as an unknown unknown.

The key takeaway here is that a risk management plan is essential when managing projects. The project
manager should do whatever is possible to prevent negative risks from happening. Given that some risks will
still arise, a contingency plan should always be in place.

Importance of Scheduling Resources and Costs

One of the leading causes of risks in a project is the failure of the project manager to schedule resources and
costs before the project begins. Having a project resource schedule in place is important for the reasons listed
below:

• allows the project manager the chance to make sure that any existing resources are adequate and
available for use because resources are often limited,

• gives the project manager a chance to decide which resources have priority;
• helps the project manager to determine where the real critical path of the project is and if there is

anything that might slow down the progress of the project down the road,
• helps the project manager determine if outside contractors will need to be used, and
• helps the project manager decide if the imposed project duration is realistic (Larson & Gray, 2021).

The failure to schedule resources properly can result in timely and costly delays in the project completion. The
lack of availability in resources can mean that outside resources may need to be brought in to help complete
the project, leading to higher costs to the organization.

MGT 4301, Project Planning 3

UNIT x STUDY GUIDE
Title

According to Larson and Gray (2021), resources can include the components listed below.

Crashing a Project

There are times when it may become necessary to crash a project or, in other words, reduce the duration of a
project. For example, if your organization is producing a product and it is determined that your product must
make it to market sooner rather than later, you may be asked to reduce the time necessary to complete
production. There are several ways this can be done, which are listed below:

• adding additional resources,
• outsourcing some of the work,
• scheduling overtime for employees,
• establishing a core team who will only work on the project, or
• creating a short-term quick solution and then going back and doing it correctly (Larson & Gray, 2021).

While none of these solutions are the best, sometimes they are the best alternative to missing a project
deadline.

Unfortunately, crashing a project can sometimes increase the risk of a project being completed late. Crashing
the project means that slack (float) on noncritical activities will be reduced. When slack of noncritical activities
is reduced, the chance of new critical paths occurring increases; hence, the risk of the project becoming late
increases. In addition, compressing will have the following impact on managing the project:

• reduces flexibility by using slack,
• increases number of critical activities,
• increases interdependencies of paths,
• makes resource scheduling tighter (critical), or
• increases costs (Larson & Gray, 2021).

MGT 4301, Project Planning 4

UNIT x STUDY GUIDE
Title

Conclusion

As you can see, risks come in many forms and can occur at any time. A successful project manager always
ensures that he or she is prepared for risks to occur by having an action plan in place before the project
begins.

Reference

Larson, E. W., & Gray, C. F. (2021). Project management: The managerial process (8th ed.). McGraw-Hill

Education. https://online.vitalsource.com/#/books/9781260736205

[https://online.vitalsource.com/#/books/9781260736205](https://online.vitalsource.com/#/books/9781260736205)

– Course Learning Outcomes for Unit IV
– Required Unit Resources
– Unit Lesson
– Risk
– A Closer Look
– Importance of Scheduling Resources and Costs
– Crashing a Project
– Conclusion
– Reference

**## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf**

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

**## unit4instructions.pdf**

Unit 4 instructions

Read Case 9.6 “The ‘Now’ Wedding-Part A and Part B” of your textbook, and imagine that you are in
charge of planning the wedding discussed in the case.
After reading the case, address the following prompts based on the case details.

Determine and describe the known and unknown risks that may prevent the wedding from
taking place on January 21, including those listed in Part B. What are some ways that these
risks will affect the wedding planning project?
Describe how you, as the wedding planner, will respond to these risks to ensure that the
wedding will still occur on the predetermined date.

Your response should be a minimum of one page in length and formatted as an essay. Citations and
references are not required; however, if outside sources are used, please adhere to APA Style when
creating citations and references for this assignment. APA formatting, however, is not necessary.

**## UnitIV.pdf**

MGT 4301, Project Planning 1

Course Learning Outcomes for Unit IV

Upon completion of this unit, students should be able to:

6. Explain the risk management process, including risk identification, analysis, and response.
6.1 Identify risks within a project and how they may affect the project.
6.2 Describe how a project manager should respond to risks found in a project.

Required Unit Resources

Chapter 7: Managing Risk—Read the following sections:

• Introduction
• 7.1–7.9
• Summary

Chapter 8: Scheduling Resources and Costs—Read the following sections:

• Introduction
• 8.1–8.10
• Summary

Chapter 9: Reducing Project Duration—Read the following sections:

• Introduction
• 9.1–9.6
• Summary

Unit Lesson

Risk

All projects involve some form of risk. Risk factors are identified and classified as known or unknown and are
accounted for accordingly. Risk factors include things that could possibly happen and that the project team is
aware of, such as inclement weather, increased supplier costs, and personnel issues, as well as unforeseen
things, such as drastic changes in market conditions, fire, and catastrophic weather in areas affecting the
project or project suppliers, and changes in customer needs (Larson & Gray, 2021). Once a risk has been
identified, it is analyzed both qualitatively and quantitatively. Qualitative analysis is based on historical
information, expert judgment, meetings, focus groups, surveys, and ranking charts. Quantitative analysis uses
statistical models and methods to determine the likelihood of a risk happening, the impact it would have on
the schedule and the cost of the project, and how severe it would be in comparison to other identified risks.

Risks have to be determined as acceptable or unacceptable for a project to continue. Unacceptable risks can
stop a project before completion. Project managers have options for responding to acceptable risks should
they occur; responses include avoiding, transferring, mitigating, or accepting the risk (Larson & Gray, 2021).
Avoiding a risk usually involves changing the project management plan to eliminate the risk entirely.
Transferring the risk gives it to someone else, usually a third party. Mitigating the risk involves finding ways to
lessen its impact on the project, and accepting the risk does not require any action unless the risk actually
occurs. The project team knows it might happen but does not do anything about it unless it does happen.

UNIT IV STUDY GUIDE
Risks and How to Properly Respond to Them

MGT 4301, Project Planning 2

UNIT x STUDY GUIDE
Title

Essentially the same process that is used to manage negative risks is applied to positive risks. The major
differences occur in the responses. Instead of avoiding negative risks, project managers often try to exploit
positive risks by taking action to ensure that the opportunity occurs. Instead of transferring risks to another
party, project managers often share positive risks to increase the likelihood that the opportunity can be
exploited. Instead of mitigating negative risks, project managers will take action to enhance the likelihood that
the opportunity will occur and/or increase the positive impact of the opportunity. Finally, project managers will
often choose to accept both negative and positive risks but be prepared to respond if either occurs.

A Closer Look

Risk is inherent in every project. It is important to know that risk occurs in the future, not in the past. Anything
that has already happened is no longer risky, even if it was a catastrophic event. There are two general
categories of risks: (1) known unknowns and (2) unknown unknowns. Let’s use some examples to gain a
better understanding of this.

• The 2011 earthquake in Japan: Given that earthquakes happen frequently in the region, most would
categorize it as a known unknown. How about the tsunami after the earthquake? It is evident that
some earthquakes can cause tsunamis; thus, one can correctly assume that this is a known
unknown. How about the threat of radiation leaks at the Fukushima plant after the tsunami washed
ashore? The answer here is a bit tougher, and it depends on whether the plant officials had a
contingency plan. If they did, it is a known unknown. If not, it is either incompetence or an unknown
unknown.

• Hurricane Katrina: The eye of the storm was shown on newscasts, and federal, state, and local
officials ordered an evacuation from the region. One notable point here is that even though the
danger was communicated, the severity was far more than expected. Thus, while the risk was a
known unknown, the actual impact might be correctly labeled as an unknown unknown.

The key takeaway here is that a risk management plan is essential when managing projects. The project
manager should do whatever is possible to prevent negative risks from happening. Given that some risks will
still arise, a contingency plan should always be in place.

Importance of Scheduling Resources and Costs

One of the leading causes of risks in a project is the failure of the project manager to schedule resources and
costs before the project begins. Having a project resource schedule in place is important for the reasons listed
below:

• allows the project manager the chance to make sure that any existing resources are adequate and
available for use because resources are often limited,

• gives the project manager a chance to decide which resources have priority;
• helps the project manager to determine where the real critical path of the project is and if there is

anything that might slow down the progress of the project down the road,
• helps the project manager determine if outside contractors will need to be used, and
• helps the project manager decide if the imposed project duration is realistic (Larson & Gray, 2021).

The failure to schedule resources properly can result in timely and costly delays in the project completion. The
lack of availability in resources can mean that outside resources may need to be brought in to help complete
the project, leading to higher costs to the organization.

MGT 4301, Project Planning 3

UNIT x STUDY GUIDE
Title

According to Larson and Gray (2021), resources can include the components listed below.

Crashing a Project

There are times when it may become necessary to crash a project or, in other words, reduce the duration of a
project. For example, if your organization is producing a product and it is determined that your product must
make it to market sooner rather than later, you may be asked to reduce the time necessary to complete
production. There are several ways this can be done, which are listed below:

• adding additional resources,
• outsourcing some of the work,
• scheduling overtime for employees,
• establishing a core team who will only work on the project, or
• creating a short-term quick solution and then going back and doing it correctly (Larson & Gray, 2021).

While none of these solutions are the best, sometimes they are the best alternative to missing a project
deadline.

Unfortunately, crashing a project can sometimes increase the risk of a project being completed late. Crashing
the project means that slack (float) on noncritical activities will be reduced. When slack of noncritical activities
is reduced, the chance of new critical paths occurring increases; hence, the risk of the project becoming late
increases. In addition, compressing will have the following impact on managing the project:

• reduces flexibility by using slack,
• increases number of critical activities,
• increases interdependencies of paths,
• makes resource scheduling tighter (critical), or
• increases costs (Larson & Gray, 2021).

MGT 4301, Project Planning 4

UNIT x STUDY GUIDE
Title

Conclusion

As you can see, risks come in many forms and can occur at any time. A successful project manager always
ensures that he or she is prepared for risks to occur by having an action plan in place before the project
begins.

Reference

Larson, E. W., & Gray, C. F. (2021). Project management: The managerial process (8th ed.). McGraw-Hill

Education. https://online.vitalsource.com/#/books/9781260736205

[https://online.vitalsource.com/#/books/9781260736205](https://online.vitalsource.com/#/books/9781260736205)

– Course Learning Outcomes for Unit IV
– Required Unit Resources
– Unit Lesson
– Risk
– A Closer Look
– Importance of Scheduling Resources and Costs
– Crashing a Project
– Conclusion
– Reference

**## 9.6VitalSourceBookshelf_ProjectManagement_TheManagerialProcess.pdf**

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

Printed by: csw8578@yahoo.com. Printing is for personal, private use only. No part of this book may be reproduced
or transmitted without publisher's prior permission. Violators will be prosecuted.

**## unit4instructions.pdf**

Unit 4 instructions

Read Case 9.6 “The ‘Now’ Wedding-Part A and Part B” of your textbook, and imagine that you are in
charge of planning the wedding discussed in the case.
After reading the case, address the following prompts based on the case details.

Determine and describe the known and unknown risks that may prevent the wedding from
taking place on January 21, including those listed in Part B. What are some ways that these
risks will affect the wedding planning project?
Describe how you, as the wedding planner, will respond to these risks to ensure that the
wedding will still occur on the predetermined date.

Your response should be a minimum of one page in length and formatted as an essay. Citations and
references are not required; however, if outside sources are used, please adhere to APA Style when
creating citations and references for this assignment. APA formatting, however, is not necessary.

**## UnitIV.pdf**

MGT 4301, Project Planning 1

Course Learning Outcomes for Unit IV

Upon completion of this unit, students should be able to:

6. Explain the risk management process, including risk identification, analysis, and response.
6.1 Identify risks within a project and how they may affect the project.
6.2 Describe how a project manager should respond to risks found in a project.

Required Unit Resources

Chapter 7: Managing Risk—Read the following sections:

• Introduction
• 7.1–7.9
• Summary

Chapter 8: Scheduling Resources and Costs—Read the following sections:

• Introduction
• 8.1–8.10
• Summary

Chapter 9: Reducing Project Duration—Read the following sections:

• Introduction
• 9.1–9.6
• Summary

Unit Lesson

Risk

All projects involve some form of risk. Risk factors are identified and classified as known or unknown and are
accounted for accordingly. Risk factors include things that could possibly happen and that the project team is
aware of, such as inclement weather, increased supplier costs, and personnel issues, as well as unforeseen
things, such as drastic changes in market conditions, fire, and catastrophic weather in areas affecting the
project or project suppliers, and changes in customer needs (Larson & Gray, 2021). Once a risk has been
identified, it is analyzed both qualitatively and quantitatively. Qualitative analysis is based on historical
information, expert judgment, meetings, focus groups, surveys, and ranking charts. Quantitative analysis uses
statistical models and methods to determine the likelihood of a risk happening, the impact it would have on
the schedule and the cost of the project, and how severe it would be in comparison to other identified risks.

Risks have to be determined as acceptable or unacceptable for a project to continue. Unacceptable risks can
stop a project before completion. Project managers have options for responding to acceptable risks should
they occur; responses include avoiding, transferring, mitigating, or accepting the risk (Larson & Gray, 2021).
Avoiding a risk usually involves changing the project management plan to eliminate the risk entirely.
Transferring the risk gives it to someone else, usually a third party. Mitigating the risk involves finding ways to
lessen its impact on the project, and accepting the risk does not require any action unless the risk actually
occurs. The project team knows it might happen but does not do anything about it unless it does happen.

UNIT IV STUDY GUIDE
Risks and How to Properly Respond to Them

MGT 4301, Project Planning 2

UNIT x STUDY GUIDE
Title

Essentially the same process that is used to manage negative risks is applied to positive risks. The major
differences occur in the responses. Instead of avoiding negative risks, project managers often try to exploit
positive risks by taking action to ensure that the opportunity occurs. Instead of transferring risks to another
party, project managers often share positive risks to increase the likelihood that the opportunity can be
exploited. Instead of mitigating negative risks, project managers will take action to enhance the likelihood that
the opportunity will occur and/or increase the positive impact of the opportunity. Finally, project managers will
often choose to accept both negative and positive risks but be prepared to respond if either occurs.

A Closer Look

Risk is inherent in every project. It is important to know that risk occurs in the future, not in the past. Anything
that has already happened is no longer risky, even if it was a catastrophic event. There are two general
categories of risks: (1) known unknowns and (2) unknown unknowns. Let’s use some examples to gain a
better understanding of this.

• The 2011 earthquake in Japan: Given that earthquakes happen frequently in the region, most would
categorize it as a known unknown. How about the tsunami after the earthquake? It is evident that
some earthquakes can cause tsunamis; thus, one can correctly assume that this is a known
unknown. How about the threat of radiation leaks at the Fukushima plant after the tsunami washed
ashore? The answer here is a bit tougher, and it depends on whether the plant officials had a
contingency plan. If they did, it is a known unknown. If not, it is either incompetence or an unknown
unknown.

• Hurricane Katrina: The eye of the storm was shown on newscasts, and federal, state, and local
officials ordered an evacuation from the region. One notable point here is that even though the
danger was communicated, the severity was far more than expected. Thus, while the risk was a
known unknown, the actual impact might be correctly labeled as an unknown unknown.

The key takeaway here is that a risk management plan is essential when managing projects. The project
manager should do whatever is possible to prevent negative risks from happening. Given that some risks will
still arise, a contingency plan should always be in place.

Importance of Scheduling Resources and Costs

One of the leading causes of risks in a project is the failure of the project manager to schedule resources and
costs before the project begins. Having a project resource schedule in place is important for the reasons listed
below:

• allows the project manager the chance to make sure that any existing resources are adequate and
available for use because resources are often limited,

• gives the project manager a chance to decide which resources have priority;
• helps the project manager to determine where the real critical path of the project is and if there is

anything that might slow down the progress of the project down the road,
• helps the project manager determine if outside contractors will need to be used, and
• helps the project manager decide if the imposed project duration is realistic (Larson & Gray, 2021).

The failure to schedule resources properly can result in timely and costly delays in the project completion. The
lack of availability in resources can mean that outside resources may need to be brought in to help complete
the project, leading to higher costs to the organization.

MGT 4301, Project Planning 3

UNIT x STUDY GUIDE
Title

According to Larson and Gray (2021), resources can include the components listed below.

Crashing a Project

There are times when it may become necessary to crash a project or, in other words, reduce the duration of a
project. For example, if your organization is producing a product and it is determined that your product must
make it to market sooner rather than later, you may be asked to reduce the time necessary to complete
production. There are several ways this can be done, which are listed below:

• adding additional resources,
• outsourcing some of the work,
• scheduling overtime for employees,
• establishing a core team who will only work on the project, or
• creating a short-term quick solution and then going back and doing it correctly (Larson & Gray, 2021).

While none of these solutions are the best, sometimes they are the best alternative to missing a project
deadline.

Unfortunately, crashing a project can sometimes increase the risk of a project being completed late. Crashing
the project means that slack (float) on noncritical activities will be reduced. When slack of noncritical activities
is reduced, the chance of new critical paths occurring increases; hence, the risk of the project becoming late
increases. In addition, compressing will have the following impact on managing the project:

• reduces flexibility by using slack,
• increases number of critical activities,
• increases interdependencies of paths,
• makes resource scheduling tighter (critical), or
• increases costs (Larson & Gray, 2021).

MGT 4301, Project Planning 4

UNIT x STUDY GUIDE
Title

Conclusion

As you can see, risks come in many forms and can occur at any time. A successful project manager always
ensures that he or she is prepared for risks to occur by having an action plan in place before the project
begins.

Reference

Larson, E. W., & Gray, C. F. (2021). Project management: The managerial process (8th ed.). McGraw-Hill

Education. https://online.vitalsource.com/#/books/9781260736205

[https://online.vitalsource.com/#/books/9781260736205](https://online.vitalsource.com/#/books/9781260736205)

– Course Learning Outcomes for Unit IV
– Required Unit Resources
– Unit Lesson
– Risk
– A Closer Look
– Importance of Scheduling Resources and Costs
– Crashing a Project
– Conclusion
– Reference